Denison has assembled a group of leading engineering and consulting firms, with mine development, metallurgical, and environmental experience applicable to the development of a large-scale uranium mining operation in northern Saskatchewan, to support the completion of the PFS for the Wheeler River project.Wheeler River is the largest undeveloped high-grade uranium project in the infrastructure rich eastern portion of the Athabasca Basin region, in northern Saskatchewan. The project is a joint venture between Denison (60% and operator), Cameco Corp. (“Cameco”) (30%), and JCU (Canada) Exploration Company Limited (“JCU”) (10%), and is host to the high-grade Gryphon and Phoenix uranium deposits discovered by Denison in 2014 and 2008, respectively.
On April 4th, 2016, Denison announced the results of a Preliminary Economic Assessment (“PEA”) for the Wheeler River Project, which considers the potential economic merit of co-developing the high-grade Gryphon and Phoenix deposits as a single underground mining operation. The PEA returned a base case pre-tax Internal Rate of Return ("IRR") of 20.4% based on the current long term contract price of uranium (US$44.00 per pound U3O8), and Denison's share of estimated initial capital expenditures ("CAPEX") of CAD$336M (CAD$560M on 100% ownership basis). Exploration results from the subsequent drilling programs have not been incorporated into the resource estimate or the PEA. The PEA is preliminary in nature and includes inferred mineral resources that are considered too speculative geologically to have
the economic considerations applied to them to be categorized as mineral reserves, and there is no certainty that the preliminary economic assessment will be realized. Mineral resources are not mineral reserves and do not have demonstrated economic viability. On July 19th, 2016 Denison announced the initiation of a Pre-Feasibility Study ("PFS") for the Wheeler River property and the complimentary commencement of an infill drilling program at the Gryphon deposit.
As previously announced on January 10, 2017, Denison has entered into an agreement with its Wheeler River Joint Venture partners, Cameco and JCU, to fund 75% of Joint Venture expenses in 2017 and 2018 (ordinarily 60%) in exchange for an increase in Denison's interest in the project to up to approximately 66%. Under the terms of the agreement, Cameco will fund 50% of its ordinary 30% share in 2017 and 2018, and JCU is expected to continue to fund its 10% interest in the project
Original Withdrawn URL: http://denisonmines.mwnewsroom.com/Files/7e/7ebbee72-e8b3-4854-acd2-c7a621a93f33.pdf