Historical Developments
2007 – 2014
Airborne geophysical survey work, geological mapping, trenching and channel sampling
Drilling – 23,622 m of drill core
Approximately C $35M in exploration related expenditures
March 2011
1. Release of inferred resource estimate (IAW NI 43-101)
March 2013
2. Release of Preliminary Economic Assessment (PEA), an NI 43-101 Technical Report
May 2015
3. Release of an upgraded inferred and indicated mineral resource (IAW NI 43-101)
October 2019
4. Release of resource upgrade with co-products (IAW NI 43-101)
2020 – 2021
5. Conduct additional mineralogy & metallurgical studies to upgrade the Bokan mill flowsheet for REEs and co-products, June 2021: (Here)
Historical Reports:
Download Preliminary Economic Assessment, Mar. 4, 2013: Ucore · SEDAR (6MB PDF) external link
> Download Preliminary Economic Assessment, Jan. 10, 2013: Ucore (7.5M PDF) external link · SEDAR (6.3MB PDF) external link
> Download Technical Report, April 21, 2011: Ucore (68 MB PDF) external link · SEDAR (126.3MB PDF) external link
[ISSUES]