Covers a range of topics this month (January):
1. Cameco Temporarily Suspending Production at Cigar Lake Mine
2. Month over Month Uranium Stock Performance
3. Denison announces decision to adopt freeze wall design for ISR Mining at Phoenix Project
4. Denison reports filing of Technical Report for Waterbury PEA
5. IsoEnergy intersects major mineralization of 74.0% U3O8 over 3.5 meters within 38.8% U3O8 over 7.5 meters in Drill Hole LE20-76
6. Forum and Orano announce budget for 6,000 meter drill program at Fir Island Uranium Project
7. Skyharbour Expands Maverick East Zone with Drill Results of 0.72% U3O8 over 17.5 meters including 1.00% U3O8 over 10.0 meters
8. Skyharbour Signs Definitive Agreement with Pitchblende Energy and Valor Resources to Option 80% of the North Falcon Point Uranium Property
9. Azincourt Energy updates geophysical program at the East Preston Uranium Project
10. Standard Uranium Finalizes Phase II Drill Program Plans at its Flagship Davidson River Project
Purepoint Uranium Video Series
YouTube: https://www.youtube.com/channel/UCbkZFKn7xoNUjkN3tk0jmfA?
Latest videos: https://purepoint.ca/videos/
and see New & Media, see updates: https://twitter.com/PurepointU3O8